Double Cage Crusher

Double Cage Crusher

Double Cage Crusher is designed according to the principle of impact crushing, inside and outside the two groups of cage bars for high-speed phase rotation, the material from the inside out through the cage bar impact and crushing, mainly for urea, ammonium phosphate and other granular materials, is a compound fertilizer crushing tool.

Double-Cage-Crusher5

Advantages of Fertilizer Auto bagging machine

  • 1, cage crusher simple structure, high efficiency, low cost, easy maintenance and overhaul, for easy to stick materials are also applicable, so it is widely used in organic fertilizer processing.
  • The machine in the crushing process using synchronized rotational speed of high-strength wear-resistant carbide cage, inlet and outlet design is reasonable, uniform crushed material, not easy to stick to the wall, easy to clean up.
  • The material through the inlet into the pants tube, divided into two ways fell into two rotors, rotors were driven by the motor by the belt rotating at high speed, rotors and motors are installed in the lower casing, rotors closed in the upper and lower casing, open the two sides of the cover can be easily cleaned, observation and maintenance.
  • Rotor spindle is supported on two bearing seats by self-aligning bearings, the spindle is equipped with a chain seat, and a ring chain is installed through the chain seat, the chain seat can protect the spindle from corrosion and damage

Rotary Coating Applicable materials

Building materials

River sand, dry mixmortar, quartz sand, casting sand andother materials.

Double-Cage-Crusher1

Coal

Coal slime, raw coal, blast furnace slag, blue charcoal, lignite fly ash and so on.

Double-Cage-Crusher2

Industrial

Desulphurized gypsum, metal powder, bentonite, fluorite powder, etc.

Double-Cage-Crusher3
Model Power (kw) Production Capacity (t/h) Inlet Size (mm) Dimensions (mm)
Tongli-600 11*2 4-6 380*320 1500*1500*1500
Tongli-800 15*2 6-10 300*250 1500*1400*1500

What Else Does TONGLI offer?

Rotary drum granulator for npk compound fertilizer

Rotary Drum Granulator

Fertilizer production line

Rotary Drum Dryer

rotary drum cooler coling machine for npk compound fertilizer production

Rotary Drum Cooler

Rotary Coating Machine

tongli heavy machinery rotary drum screener trommel machine for npk compound fertilizer production

Rotary Trommel/Screener

tongli heavy machinery bag house filter for npk compound fertilizer production dedusting system

Dedusting system

tongli heavy machinery auto-batching system for npk compound fertilizer production raw material feeding system

Auto-batching system

TONGLI Compound Fertilizer Production Line Manufacturer

Auto-packaging system

tongli heavy machinery auto-palletizing system for npk compound fertilizer production finished product palletizing system, palletizer

Auto-palletizing system

Reach us through

Send us a Message

Our Products

We are the industry heads and produce the most reliable and trendy fertilizer production line solution you are looking for.

NPK compound fertilizer steam granulation solution

Suitable for making compound fertilizers, organic fertilizers and mixed fertilizers with diversified formulas with large output

NPK roller extrusion granulation method production

Save energy consumption, flexible output, small investment

High tower prilling method npk fertilizer production

Large investment, large output, suitable for making high-nitrogen NPK compound fertilizer

BB fertilizer blending line

Small investment, flexible output, and can mix a variety of formulas

The only place where you’ll get the perfect solution for fertilizer industry needs.

Frequently Asked Questions

1. Installation: After the machine arrives at the factory, it will be installed in conjunction with the process, indicating the elevation and horizontal position, tilted installation, generally tilted at 2-5 degrees (which can be adjusted to make the user’s needs), and the machine bracket and transmission frame even ground angle holes, which can be mounted on rolled condensed soil.

① machinery each base and the foundation between the pad into the deed-shaped mat board thickness should not be greater than 30-35mm;

② the height of the base with the deed-shaped pad to adjust the height of the base to make the base 5 degrees of inclination;

③ After each base is adjusted properly, put the cylinder on the support and adjust the carrier wheel;

④ Install the drive part of the film wrapping machine;

⑤ Be sure that the bracket wheel, transmission device and cylinder are properly adjusted and start pouring cement, and after 8-10 days, start the no-load test run after the cement is solidified;

⑥ Method of adjusting the position of the machine body:

a. On the full length of the left and right sides of the machine body, install two parallel steel wires with a diameter of 0.5-1mm and check the level of the wires with a level meter;

b.Lower two phase hammers tangent to the rolling circle from each rolling circle down the sides of the dryer;

c.Measure the distance from the steel wire to the wire drop to detect the body in the horizontal position;

d. Measure the relative vertical elevation of the two rolling circles to check the position of the machine body in the vertical plane;

e. Use the method of moving the electric torque wheel to adjust the measurement of the two articles c and d, so that the machine body is in the correct position;

2. No-load test run:

1). Uninterrupted no-load for 8 hours, the temperature of each bearing should rise smoothly, and the temperature of the bearing should not be higher than 50 degrees Celsius at the termination of the test run;

2). The noise of gears should be average and should not be high or low;

3). After the test run, the bearings shall be observed without serious wear and abrasion.

A.Starting the machine

1. The following preparations should be made before starting the film wrapping machine;

a. Check and adjust the powder feeding device and protection equipment;

b. All bearings and lubricating devices of friction surfaces should have appropriate quantity of grease;

2. It is forbidden to start the film wrapping machine without checking the film wrapping machine and auxiliary mechanical equipment;

3. The steps to start the film wrapping machine are as follows:

a. Start the motor of the film wrapping machine.

b. Start the feeding and discharging conveying equipment.

B. Stopping

1. The steps to stop the film wrapper are as follows:

A. Stop adding raw material to the wrapper;

B. Turn off the drive motor of the wrapping machine;

C. Stop the equipment for transporting granular materials;

1. Dry grease should be smeared at the gears before starting the machine;

2. Dry grease to be smeared on the surface of rolling belt once in 7 days;

3. Bearing housing to be hit or renewed with new dry grease every three months;

4. Add gear oil once before the reducer is used and replace it every four months thereafter;

Pinion gear is worn, install pinion gear upside down, if both sides are worn, new gear is needed.
The intermediate connection between the large gear and the cylinder is damaged, adjust the connection and make appropriate treatment if necessary.

Clamping roller belt to the side of a concave joint

Clamp the belt to the concave joints with pads or wedges, but beware of over-clamping, which can lead to accidents, but uneven tensioning can cause the machine to jump and vibrate.

Wheel wear Refurbish or replace the wheel according to the degree of wear
Block wheel wear Repair, move, or replace with new block wheel depending on degree of wear

Simple body vibration